Waterfront Project

Sinisian Development

Mlion Corporation successfully delivered 178 pieces of Long Length Spiral Steel pipes for Sinisian Lemery Batangas Port and Industrial Park Corporation.

Project Info

The project which conceptualised in 2019 finally got off the ground in 2021 with commercial negotiations. Mlion worked with the engineering group to ensure that piles will meet the standards and delivered to the job site. There were fabrication works to splice 16mm and 14mm pipes together as well as a Pile Plug and Stiffener Rings. Pile lengths varied up to 54m in total. What made the project more challenging was the varying stiffener right distance in the middle of the pipes.

As site location was 15km away from the nearest port, we scheduled our international vessel to call at the site location, reducing additional transfer and cost to the customer.

Mlion also included GoTagID technology onto the piles so that piles could be scanned and encoded with pipe numbers for better traceability and quality control after delivery.

Pile Sizes Delivered:
1000mm OD x 16m x 14m
Length up to 54m
Steel Grade 355
GoTagID Technology Incorporated

Planning to
build Something?

You can reach us by using our Contact Form
or using our Project Estimator.

WATERFRONT

Flood protection and waterfront structures for berthing facilities for harbours and port projects.

UNDERGROUND

Substructure Foundation Works for Drilling,
Tunneling and Earth Retaining Structures.

RAILS

Crane Rails and Accessories for Port
and Material Handling purposes.

PROJECT SERVICES

Consultancy for design
and feasibility studies.

Sheet Piles

Hot Rolled Cold Formed
MHZ MMZ
MHU MMU
HAT MLL
FLAT WEB

STRUCTURAL SECTIONS

TIE RODS

UPSET END TIE RODS

Need to Estimate a Solution?