T235 Viaduct and Tunnels For RTS Link

Mlion Corporation delivers Spiral Welded Steel Pipes for Singapore LTA T235 Project. The pipes will be used for Viaduct and Tunnel Construction of the upcoming RTS Link to Johor Bahru. China Communications Construction Company awarded Mlion Corporation the supply of 2.08m, 1.8m and 1m Diameter x 16mm thickness.

When completed, the viaduct will stand 25m above the Johor Strait within Singapore’s territory and continue inland where it will transition to underground tunnels leading to the RTS Link Woodlands North station.

Image Courtesy of LTA

Related Articles

East Malaysia Petrochemical Complex

East Malaysia Petrochemical Complex

Mlion Corporation delivers Long Length Steel Pipes for an East Malaysian Petrochemical Complex project. The piles are 45m in length and will be delivered to site. Piles will be used for the jetty and waterfront requirements of the project. The pipes required...

Sinisian Development

Sinisian Development

Mlion Corporation successfully delivered 178 pieces of Long Length Spiral Steel pipes for Sinisian Lemery Batangas Port and Industrial Park Corporation. The project which conceptualised in 2019 finally got off the ground in 2021 with commercial negotiations. Mlion...

Batangas Ilijan Power Plant

Batangas Ilijan Power Plant

Mlion Corporation delivered 7 pieces of 4m Diameter Steel Pipes for a Batangas Combined Cycle Power Plant Project. Mlion Corporation delivered 7 pieces of 4m Diameter Steel Pipes for a Batangas Combined Cycle Power Plant Project. The pipes included fabrication of...

WATERFRONT

Flood protection and waterfront structures for berthing facilities for harbours and port projects.

UNDERGROUND

Substructure Foundation Works for Drilling,
Tunneling and Earth Retaining Structures.

RAILS

Crane Rails and Accessories for Port
and Material Handling purposes.

PROJECT SERVICES

Consultancy for design
and feasibility studies.

Sheet Piles

Hot Rolled Cold Formed
MHZ MMZ
MHU MMU
HAT MLL
FLAT WEB

STRUCTURAL SECTIONS

TIE RODS

UPSET END TIE RODS

Need to Estimate a Solution?