Batangas Ilijan Power Plant
Mlion Corporation delivered 7 pieces of 4m Diameter Steel Pipes for a Batangas Combined Cycle Power Plant Project. Fabrication included accessories, and welding works required for Intake and Outfall Structure works.
Project Info
Project Scope:
4000mm OD Pipes with Stiffener Rings
Length 14.5m to 15.5m
Flanges welded to ends of Pipes
Blind Flange attached
Delivery Scope:
Customised support and logistics required for loading the pipes into vessel.
On site inspections and coordination to ensure unloading of pipes into and out of Mother Vessel.
2 Barges were chartered to take the materials from Manila to Batangas.
Round the clock operations to ensure that material arrive safely and unloaded onto site.